
“Phase 1A continues to enable the space enterprise to respond to the rapidly evolving operating environment. John Thompson, SMC commander and program executive officer for space, said in a statement. In June 2014, Lockheed Martin was contracted by the USAF to build SBIRS GEO-5 and SBIRS GEO-6, at a cost of US1.86 billion.
#Sbirs geo 5 and 6 spacex update#
“The competitive award of these EELV launch service contracts directly supports SMC’s mission of delivering resilient and affordable space capabilities to our nation while maintaining assured access to space,” Lt. The first SBIRS GEO satellite of the SBIRS program, SBIRS GEO-1, was successfully launched from Cape Canaveral on an Atlas V launch vehicle on. Atlas 5/SBIRS GEO 5 launch timeline This is the launch timeline to be followed by the Atlas 5 rocket’s ascent into orbit from Cape Canaveral with the SBIRS GEO 5 satellite for U.S. These newest infrared surveillance and missile warning satellites, known as GEO-5 and GEO-6, will be based on Lockheed Martin’s modernized LM 2100 spacecraftan update that improves system affordability and resiliency while also adding the flexibility to use future payloads.

31, 2018 and proposals were due April 16, 2018. The final request for proposals for these launches was released Jan. This is the sixth competition under the current Phase 1A EELV procurement.


NROL-85, NROL-87 and Silent Barker are classified missions for the National Reconnaissance Office. The Space-Based Infrared System Geosynchronous Earth Orbit SBIRS GEO-5, SBIRS GEO-6 and AFSPC-44 are Air Force satellites. SpaceX will receive $297 million to launch AFSPC-44, NROL-85, and NROL-87.
